The King’s School Main Campus project photo

THE KING'S SCHOOL CANTERBURYVATTANACVILLE - MAIN CAMPUS

LOCATION:
Cambodia

STATUS:
Under construction

PROJECT TYPE:
Education

BUILT AREA:
90,000 SQM, 10 Hectare site

ROLE:
Project Architect (Design Manager), Vattanac Properties

SCOPE:
design management during design and construction stages, interior design mood board and development , loose furniture and material selection, executive architect role- directing the production of construction documents, tender support, value engineering, site inspection, and directing the production of the  visualizations (seen here) and animation including developing the story board.

CREDITS:
IN-HOUSE TEAM: Sudeep.S- Team leader, Vuth Dy-Senior  architect, Sokun Borint- Junior architect; DESIGN ARCHITECT- Walters & Cohen Architects, UK; VISUALISATION- CG Scape; LANDSCAPE- Ecoplan Asia; CIVIL, STRUCTURES, MEP- Mott Mc Donald, HK; ACOUSTICS- Alpha Acoustics, SG; THEATRE SPECIALIST- Theatre Tech, UK

The main campus caters to students from early years to Year 13, featuring sports facilities, student and staff housing, and a state-of-the-art performing arts venue. As the design manager, I served as the primary liaison between the Executive Director and consultants. I played a crucial role in developing a sensitive and practical design that adhered to local codes, construction practices, culture, and materials, while ensuring client satisfaction and budget compliance. I streamlined the coordination process with the international design team, mentored consultants, and adapted the design to incorporate local materials, passive cooling techniques, and cost-effective structural systems. As the executive architect, I led my in-house team to align architectural design with value-engineered MEP and structural designs, producing construction documentation for local contractors. Additionally, I am assisting the QS team in contractor selection and appointment during the tendering and post-tender process.

PROJECT IMAGES